File #: 2021-0617   
Type: Consent Calendar Item Status: Agenda Ready
File created: 6/2/2021 In control: Transportation and Public Works
On agenda: 7/13/2021 Final action:
Title: 2021 Thermoplastic Road Striping and Markings Project, M21502
Department or Agency Name(s): Transportation and Public Works
Attachments: 1. Summary Report, 2. Location Map

To: Board of Supervisors

Department or Agency Name(s): Transportation and Public Works

Staff Name and Phone Number: Johannes J. Hoevertsz 707-565-2231

Vote Requirement: Majority

Supervisorial District(s): Countywide

 

Title:

Title

2021 Thermoplastic Road Striping and Markings Project, M21502

End

 

Recommended Action:

Recommended action

A)                     Approve the Specifications for the 2021 Thermoplastic Road Striping and Markings Project, M21502.

B)                     Award contract to low bidder, Central Striping Services, Inc., in the amount of $249,598.75, approve a 25% contingency for construction in the amount of $62,399.68, for a total amount not to exceed $311,998.43, and authorize the Chair to execute the construction contract for M21502.

end

 

Executive Summary:

A primary goal of the Department of Transportation and Public Works (TPW) is to maintain a transportation system that is safe for motorists, pedestrians, and bicyclists. A major component of these safety efforts is clearly visible road striping and markings especially in areas with high volumes of vehicle, bicycles, and pedestrian traffic. TPW is requesting approval of the project Specifications and a Contract in order to apply and enhance road striping and markings on intersections, crosswalks, and roads throughout the County.

 

Discussion:

Periodically, TPW issues a striping and markings contract to refresh and enhance pavement striping in school zones and other high-volume areas.

The project calls for thermoplastic material rather than the traditional paint and includes various County roads, signalized intersections, and crosswalks in both high-volume pedestrian and school areas.

Locations are shown on the attached Location Map.

The project was advertised in the Press Democrat and posted to the County’s Purchasing Portal from May 6 to May 28, 2021.

Electronic bids were opened on: May 28, 2021.

Base bids received were as follows:

Central Striping Services                     $249,598.75

Apply A Line                                                               $270,198.64

Chrisp Company                                          $346,420.50

The Engineers Estimate was:  $444,995.00.

The low bid of $249,598.75 is $195,396.25, 44% below the Engineer’s Estimate. The second bid is 8% above the low bid. The major difference between the bid and the estimate are the costs for the striping items and traffic control items.

In accordance with Public Contract Code Section 20128, the contract shall be awarded to the lowest responsive and responsible bidder. There is not a set of plans for this project and all locations are in the project Special Provisions.

Central Striping Services is experienced in this type of work. They have been licensed since 1981 and have worked on numerous County road projects as a prime and sub-contractor.

 

Prior Board Actions:

None

 

Fiscal Summary

 Expenditures

FY 21-22 Adopted

FY22-23 Projected

FY 23-24 Projected

Budgeted Expenses

$311,998.43

 

 

Additional Appropriation Requested

 

 

 

Total Expenditures

$311,998.43

 

 

Funding Sources

 

 

 

General Fund/WA GF

$155,999.21

 

 

State/Federal/Local Taxes

$155,999.22

 

 

Fees/Other

 

 

 

Use of Fund Balance

 

 

 

Contingencies

 

 

 

Total Sources

$311,998.43

 

 

 

Narrative Explanation of Fiscal Impacts:

Appropriations for this contract are included in the FY 2021-22 Roads Maintenance (11051-34010102) recommended budget. Funding for Roads Maintenance comes from multiple sources including; the State Highway Users Tax, Senate Bill 1 Road Maintenance and Rehabilitation Program, contributions from Sonoma County’s General Fund, and allocations from Measure M.

 

Narrative Explanation of Staffing Impacts (If Required):

None

 

Attachments:

Location Map

 

Related Items “On File” with the Clerk of the Board:

Bid Book, Special Provisions