Legislation Details

File #: 2022-1286   
Type: Consent Calendar Item Status: Passed
File created: 10/31/2022 In control: Public Infrastructure
On agenda: 12/13/2022 Final action: 12/13/2022
Title: Second Amendment to Professional Services Agreement with TRC Engineers Inc. for design of the Franz Creek Bridge Replacement Project
Department or Agency Name(s): Public Infrastructure
Attachments: 1. Summary Report, 2. Amendment 2 - C14007 TRC Franz, 3. Amend 2 TRC Scope - Cultural Services Franz Creek

To: Board of Supervisors

Department or Agency Name(s): Sonoma County Public Infrastructure

Staff Name and Phone Number: Johannes J. Hoevertsz, 707-565-2231

Vote Requirement: Majority

Supervisorial District(s): First, Fourth

 

Title:

Title

Second Amendment to Professional Services Agreement with TRC Engineers Inc. for design of the Franz Creek Bridge Replacement Project

End

 

Recommended Action:

Recommended action

Approve and authorize the Chair to execute a second amendment to the professional services agreement with TRC Engineers Inc. for design of the replacement of the Franz Valley School Road Bridge over Franz Creek, increasing the contract amount by $63,111 for a new total not-to-exceed amount of $783,108. (First and Fourth District)

end

 

Executive Summary:

The Sonoma County Department of Public Infrastructure (SPI) is requesting Board approval of a second amendment to the design contract with TRC Engineers Inc. for replacement of Franz Valley School Road Bridge over Franz Creek. If approved, the second amendment will increase the total contract value by $63,111 in order to complete additional cultural resources studies after cultural resources were discovered at the proposed construction site.

 

Discussion:

The existing two-lane bridge on Franz Valley School Road over Franz Creek (Bridge Number 20C0326) has been found to be scour critical, requiring replacement. The Franz Valley School Road Bridge Replacement Project will include improvements to the roadway approaches and pertinent facilities. The new replacement bridge will comply with current roadway, drainage and bridge standards to accommodate the 100-year storm event with freeboard as specified by the County of Sonoma.

The project is receiving federal funds and must satisfy all requirements of the Federal Highway Bridge Program, including approval by Caltrans.

The Board approved the original design contract with TRC Engineers Inc. on October 24, 2017. The Board approved a first amendment to add additional design services and extend the term of the contract on July 13, 2021.

During initial cultural resources investigations, human artifacts were discovered at the proposed construction site. Based on these findings, TRC Engineers Inc. and their subconsultants are required to provide cultural resource reports for National Environmental Policy Act (NEPA) clearance. Because NEPA clearance is required for project permitting, the Sonoma County Department of Public Infrastructure (SPI) is recommending that the Board approve a Second Amendment to complete the required reports. If approved, the Amendment would increase the contract value by $63,111, resulting in a not to exceed contract amount of $783,108 with a term ending December 31, 2027.

 

Strategic Plan:

This item directly supports the County’s Five-year Strategic Plan and is aligned with the following pillar, goal, and objective.

 

Pillar: Resilient Infrastructure

Goal: Goal 3: Continue to invest in critical road, bridge, bicycle, and pedestrian infrastructure.

Objective: Objective 4: Identify and retrofit bridges in County that are at high risk for damage during earthquakes.

 

Prior Board Actions:

10/24/2017, Item 23: Board approved agreement with TRC Engineers Inc. for engineering design work for Franz Creek Bridge replacement.

7/13/2021, Item 24: Board approved amendment 1 with TRC Engineers Inc. for additional engineering design work for Franz Creek Bridge replacement.

 

Fiscal Summary

 Expenditures

FY 22-23 Adopted

FY23-24 Projected

FY 24-25 Projected

Budgeted Expenses

 

$63,111

 

Additional Appropriation Requested

 

 

 

Total Expenditures

 

$63,111

 

Funding Sources

 

 

 

General Fund/WA GF

 

 

 

State/Federal

 

$63,111

 

Fees/Other

 

 

 

Use of Fund Balance

 

 

 

Contingencies

 

 

 

Total Sources

 

$63,111

 

 

Narrative Explanation of Fiscal Impacts:

Appropriations for this work will be included in the FY 2023-2024 Roads Capital (11051-34040103) Requested budget. SPI has applied for reimbursement for these expenditures through the Federal Highway Bridge Program (HBP) but the application has not been approved. In the event the application is denied, the Department would use annual allocations from traditional Roads funding sources such as Highway User Tax Account (HUTA) or Road Maintenance and Rehabilitation Account (SB1) to pay for the additional contract costs.

 

Narrative Explanation of Staffing Impacts (If Required):

N/A

 

Attachments:

Amendment No. 2

Amendment No. 2 Scope of Work

 

Related Items “On File” with the Clerk of the Board:

Original Contract Agreement

Amendment No. 1