File #: 2025-0916   
Type: Consent Calendar Item Status: Agenda Ready
File created: 8/8/2025 In control: Sonoma County Water Agency
On agenda: 9/23/2025 Final action:
Title: Water Transmission System Cathodic Protection Assessment
Department or Agency Name(s): Sonoma County Water Agency
Attachments: 1. Summary Report, 2. Att1 Draft Agreement with Accurate Corrosion Control, Inc., 3. Att2 Competitive Selection Process Memo

To: Board of Directors, Sonoma County Water Agency

Department or Agency Name(s): Sonoma County Water Agency

Staff Name and Phone Number: Grant Davis 707-547-1911, Scott Cameron 707-292-2254

Vote Requirement: Majority

Supervisorial District(s): Countywide

 

Title:

Title

Water Transmission System Cathodic Protection Assessment

End

 

Recommended Action:

Recommended action

Authorize Sonoma County Water Agency’s General Manager to execute an agreement with Accurate Corrosion Control, Inc., in substantially the form presented to this Board, for corrosion protection assessments through July 31, 2028, in the not-to-exceed amount of $285,542.

end

 

Executive Summary:

Under this proposed agreement, Sonoma County Water Agency (Sonoma Water) seeks to improve the long-term reliability of infrastructure throughout Sonoma Water’s water transmission system by evaluating the effectiveness of the existing corrosion protection systems, identifying deficiencies, and developing a strategy to implement improvements.

 

Discussion:

HISTORY OF ITEM/BACKGROUND

Sonoma Water owns, operates, and maintains over 80 miles of large diameter pipelines which are used to convey potable drinking water to residents in Sonoma County and Marin County.  The pipelines are made of cement mortar lined and coated steel pipe.  Installation dates range from the late 1950’s through the early 2000’s.  Corrosion protection measures generally reflect the conventions at the time of construction.

 

Sonoma Water also owns and operates six Ranney collector wells located along the Russian River that provide water for the transmission system.  All six collectors utilize an impressed current corrosion protection system to protect metallic components. In addition, Sonoma Water’s above-ground steel tanks serve to provide storage and pressure throughout the water transmission system.  Tanks are individually supported by a steel-reinforced concrete slab and have an epoxy coated interior and exterior.  Tanks are also protected by an impressed current corrosion protection system.

 

Impressed current systems require periodic testing and calibration to ensure they are providing adequate corrosion protection to metallic structures.  Changes in soil, water chemistry, failed equipment, and nearby pipelines from other utilities can affect the level of protection provided.  Testing can also help identify where corrosion may be occurring. 

 

SELECTION PROCESS

Accurate Corrosion Control, Inc (Consultant) was selected from a list of qualified consultants developed from a competitive selection process.  Attached is a memo that explains the competitive selection process.

 

Consultant was selected for the subject work because of their extensive experience performing corrosion protection engineering services for water, wastewater and natural gas utilities across the United States.  Notably, the Consultant has extensive experience working with PG&E’s gas division in Northern California, which will benefit Sonoma Water’s ongoing coordination efforts with PG&E.

 

SERVICES TO BE PERFORMED

Under the agreement, Consultant will evaluate the effectiveness of the existing corrosion protection systems, identify deficiencies, and develop a long-term corrosion protection strategy and program.  The cost of services will not exceed $285,542; the term end date is July 31, 2028.

 

Through the agreement, the General Manager will be delegated the authority to approve a written amendment to extend the term of the agreement for up to two additional years by providing written notice to the other party thirty days in advance of the expiration date and by executing an agreement amendment.

 

County of Sonoma Strategic Plan Alignment:

N/A

Sonoma Water Strategic Plan Alignment:

Goal:  Planning and Infrastructure

Strategy:  Conduct planning that integrates and balances operational, maintenance, and infrastructure priorities.

Action:  Continue to engage in planning efforts and partnerships to protect and

enhance our water supply.

 

Assessing Sonoma Water’s water transmission system ensures the system is well-protected from corrosion, helping maintain the life of the system and protecting the region’s water supply.

 

Racial Equity:

 

Was this item identified as an opportunity to apply the Racial Equity Toolkit?

No

 

Prior Board Actions:

1/10/2017:                     Board approved Third Amended Agreement for Petaluma Aqueduct Cathodic Protection Upgrade Design Services between Sonoma Water and JDH Corrosion Consultants, Inc for a new not-to-exceed agreement total of $227,000 and end date of January 31, 2019.

6/25/2013:                     Board approved Second Amended Agreement for Petaluma Aqueduct Cathodic Protection Upgrade Design Services between Sonoma Water and JDH Corrosion Consultants, Inc for a new not-to-exceed agreement total of $155,430 and end date of June 30, 2017.

4/26/2011:                     Board approved Agreement for Petaluma Aqueduct Cathodic Protection Upgrade Design Services between Sonoma Water and JDH Corrosion Consultants, Inc.  Agreement total $115,000, term end date July 1, 2012.

8/19/2008:                     Board approved agreement between Sonoma Water and JDH Corrosion Consultants, Inc. for As-Needed Cathodic Protection Systems Evaluation for a new not-to-exceed agreement total of $50,000 and end date of June 30, 2010.

 

Fiscal Summary

 

Expenditures

FY25-26 Adopted

FY26-27 Projected

FY27-28 Projected

Budgeted Expenses

$285,542

 

 

Additional Appropriation Requested

 

 

 

Total Expenditures

$285,542

 

 

Funding Sources

 

 

 

General Fund/WA GF

 

 

 

State/Federal

 

 

 

Fees/Other

$285,542

 

 

Use of Fund Balance

 

 

 

General Fund Contingencies

 

 

 

Total Sources

$285,542

 

 

 

Narrative Explanation of Fiscal Impacts:

Budgeted amount of $285,542 is available from FY 2025/2026 appropriations for the Water Transmission fund.  No additional appropriation is required.

 

 

Staffing Impacts:

 

 

 

Position Title (Payroll Classification)

Monthly Salary Range (A-I Step)

Additions (Number)

Deletions (Number)

 

 

 

 

 

 

 

 

 

 

 

 

 

Narrative Explanation of Staffing Impacts (If Required):

N/A

 

Attachments:

Attachment 1:  Draft Agreement with Accurate Corrosion Control, Inc

Attachment 2:  Competitive Selection Process Memo

 