Legislation Details

File #: 2026-1038   
Type: Consent Calendar Item Status: Agenda Ready
File created: 9/10/2026 In control: Public Infrastructure
On agenda: 10/27/2026 Final action:
Title: 2026 Pavement Preservation Program Full Depth Reclamation and Overlays Project – Construction Contract Change Order
Department or Agency Name(s): Public Infrastructure
Attachments: 1. Summary Report

To: Board of Supervisors

Department or Agency Name(s): Sonoma County Public Infrastructure

Staff Name and Phone Number: Johannes J. Hoevertsz, 707-565-2550

Vote Requirement: 4/5th

Supervisorial District(s): Countywide

 

Title:

Title

2026 Pavement Preservation Program Full Depth Reclamation and Overlays Project - Construction Contract Change Order

End

 

Recommended Action:

Recommended action

Approve and authorize the Director of Public Infrastructure to execute a construction contract change order with Ghilotti Construction Company in the amount of $296,623.38, for the 2026 Pavement Preservation Program (PPP) Full Depth Reclamation and Overlays Project (C26101).

end

 

Executive Summary:

The Sonoma Public Infrastructure Department (SPI) requests Board approval to authorize the Director of SPI to execute a construction contract change order in an amount not to exceed $296,623.38 for the 2026 Pavement Preservation Program (PPP) Full Depth Reclamation and Overlays Project (C26101) to address additional work on Geysers Road. The cost of the additional work is available within the original contract contingency.

Under Public Contract Code Section 20395 and Sonoma County Code Section 2-29, the Road Commissioner’s authority to execute an individual change order for this contract is limited to $210,000. Because the proposed change order exceeds this amount, Board approval is required.

 

Discussion:

On March 2, 2021, the Board approved a five-year Strategic Plan that included a Resilient Infrastructure pillar and related objectives. Investments in ongoing maintenance and capital improvements to the County’s infrastructure support these objectives by reducing maintenance liabilities, maximizing the use of taxpayer dollars, improving public safety, and improving access to services. As part of this strategic goal, the Board has prioritized investment in transportation infrastructure through the annual Pavement Preservation Program (PPP), which provides funding for ongoing maintenance and improvements to the County’s road network.

On June 3, 2025, the Board approved the 2026 Pavement Preservation Program project list, which included pavement preservation work on Geysers Road. On March 10, 2026, the Board approved a modified project list; however, the location and planned pavement treatment for Geysers Road remained unchanged. On May 13, 2026, following a competitive bidding process, SPI awarded a construction contract to Ghilotti Construction Company under Road Commissioner authority pursuant to Sonoma County Code Sections 2-29, in the amount of $9,096,558.50.

During the preconstruction meeting with Ghilotti Construction Company, it was determined that additional work would be required on Geysers Road that was not identified in the original project plans and contract documents. Localized pavement failures and roadway profile irregularities require additional pavement structural section repairs, cold plane grinding, and asphalt concrete leveling beyond the quantities and scope included in the original contract.

In addition, the pavement repairs require a greater depth of asphalt concrete than originally scoped in the project plans. The additional work is necessary to provide a suitable roadway surface, including proper profile and cross slope prior to placement of the planned asphalt concrete overlay. The cost of the additional work is estimated at up to $296,623.38 and is available within the original contract contingency; however, the proposed change order exceeds the Director’s delegated contract authority and requires Board approval.

SPI now requests that the Board authorize the Director of Sonoma Public Infrastructure to execute a construction change order in an amount not to exceed $296,623.38 for the additional pavement repairs on Geysers Road. 

 

Strategic Plan:

 

This item directly supports the County’s Five-year Strategic Plan and is aligned with the following pillar, goal, and objective.

 

Pillar: Resilient Infrastructure

Goal: Goal 3: Continue to invest in critical road, bridge, bicycle, and pedestrian infrastructure.

Objective: Objective 1: Continue to maintain road segments, including designated turnouts where feasible, increase efforts on vegetation removal and drainage features, and improve pavement conditions in neighborhoods.

 

 

Racial Equity:

 

Was this item identified as an opportunity to apply the Racial Equity Toolkit?

No

 

 

Prior Board Actions:

3/10/2026 Item #18 - 2026 and 2027 Pavement Preservation Program Road List Changes

 

6/3/2025 Item #41 - Board Approved 2026 and 2027 Pavement Preservation Program Funding and List of Projects

 

 

 

 

 

 

 

 

 

Fiscal Summary

 Expenditures

FY26-27 Adopted

FY27-28 Projected

FY28-29 Projected

Budgeted Expenses

$296,623.38

 

 

Additional Appropriation Requested

 

 

 

Total Expenditures

$296,623.38

 

 

Funding Sources

$296,623.38

 

 

General Fund/WA GF

 

 

 

State/Federal

 

 

 

Fees/Other

 

 

 

Use of Fund Balance

 

 

 

General Fund Contingencies

 

 

 

Total Sources

$296,623.38

 

 

 

Narrative Explanation of Fiscal Impacts:

Appropriations for the proposed construction contract change order are available in the FY 2026-27 Roads Capital (11051-34010103) adopted budget. The funding sources for the project include contributions from the General Fund and SB1.  The proposed change order is within the 15% construction contract contingency for this project, as well as appropriations previously approved by the Board during the FY 2026-27 Budget Hearings.

 

Narrative Explanation of Staffing Impacts (If Required):

None.

 

Attachments:

None.

 

Related Items “On File” with the Clerk of the Board:

None.