File #: 2024-0493   
Type: Consent Calendar Item Status: Passed
File created: 4/11/2024 In control: Public Infrastructure
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Approval of Right of Way Contract for the North Fitch Mountain Road Repair Project
Department or Agency Name(s): Public Infrastructure
Attachments: 1. Summary Report, 2. Location Map Pg 8896 Silge_087-043-019_ROW, 3. Silge Signed Grant of Easement, 4. Silge Signed Grant of Temporary Construction, 5. Silge Signed ROW Contract with Exhibits 4 16 24.pdf

To: Board of Supervisors

Department or Agency Name(s): Sonoma County Public Infrastructure

Staff Name and Phone Number: Johannes J. Hoevertsz, 707-565-2550

Vote Requirement: Majority

Supervisorial District(s): Fourth

 

Title:

Title

Approval of Right of Way Contract for the North Fitch Mountain Road Repair Project

End

 

Recommended Action:

Recommended action

A)                     Delegate authority to the Director of Sonoma County Public Infrastructure (SPI) to execute the proposed Right of Way Contract with Ellen G. Silge, as Trustee, for $107,600, for certain real property rights needed for the North Fitch Mountain Road repair project.

B)                     Delegate authority to the Director of SPI to execute certificates of acceptance in accordance with Government Code Section 27281, and all other instruments and materials, in form approved by County Counsel, as needed to close the subject real property transaction.

end

 

Executive Summary:

The Sonoma County Department of Public Infrastructure (SPI), Roads Division is requesting the Board approve a Right of Way Contract with Ellen G. Silge, Successor Trustee of the Silge Family 2005 Trust, Under Declaration of Trust, dated January 24, 2005, in the amount of $107,600, for the purchase of certain permanent and temporary easement rights needed for the road repair project over a portion of N. Fitch Mountain Road in Healdsburg (Roads Project Number C11601). The property rights are needed in order for the County to make permanent repairs to the roadway and prevent additional slope failures and/or closure of the subject roadway, and the owner accepted the County’s offer of just compensation at the appraised value of the property rights.

 

Discussion:

During the January 2017 winter storm event, several sites along North Fitch Mountain Road were severely damaged.  Among the sites is a slip out at road mile marker 13.20. The slip out extended approximately 350-feet and produced a 1-foot slump in the roadway surface along the roadway centerline between the eastbound and westbound lanes. The roadway continues to move and significant, long-term repairs are needed. 

A project to repair all of the damaged sites and mitigate for future slope and drainage conditions has been planned and is preparing for construction. The project will address the slip and affected roadway, and will include constructing a 4-foot wide by 335-foot long drainage trench between 25-feet and 37-feet deep, reconstruction of a roadway ditch, installation of an 18-inch corrugated metal pipe (CMP) cross culvert with a 24-inch CMP over side drain outlet, guardrail installation, and removing and reconstructing the upper five feet of the existing roadway.

To finalize design and begin the construction phase of the Project, SPI has been working to acquire necessary temporary and permanent easements from six (6) property owners. To date, four (4) of those owners have conveyed the properties needed. After this proposed agreement with owner Silge, only one other property owner will remain outstanding, and that matter is scheduled for an eminent domain Hearing of Necessity in the near future.

An Appraisal Report and an Appraisal Review Report were prepared for the subject property by two independent certified General Appraisers in accordance with Caltrans Guidelines and federal regulations.  An offer of just compensation was delivered on May 22, 2023 to the property owners.  The owner has now signed the proposed Right of Way Contract and related conveyance documents.

The total area of permanent easement is 1,173 square feet and the total temporary construction easement area is 4,574 square feet.  The easements impact two (2) properties known as 1840 Redwood Drive and 1845 N. Fitch Mountain Road, Healdsburg, CA.  The permanent easement is for slope and drainage purposes and the temporary construction easement is for additional work area including storage of materials and equipment.

Design and environmental permitting for this project is substantially complete. After completion of right of way acquisition, SPI will issue a Request for Proposals for the construction phase. Currently, SPI anticipates construction to be completed in calendar year 2025. The total project costs are estimated to be $3,717,416.  The primary funding for this project comes from the Federal Highway Administration Emergency Relief Grant Program (FHWA-ER) for 88.53% and Prop 1B for 11.47% of eligible Right of Way costs through Caltrans.

Procedural Authority: Pursuant to Government Code sections 25350 and 25350.5 and the Streets and Highways Code, the County is authorized to acquire real property and interests therein for the uses and purposes of county highways. Said acquisitions can be undertaken without compliance with extended noticing and other process requirements required for other real property acquisitions.

 

Strategic Plan:

 

This item directly supports the County’s Five-year Strategic Plan and is aligned with the following pillar, goal, and objective.

 

Pillar: Resilient Infrastructure

Goal: Goal 3: Continue to invest in critical road, bridge, bicycle, and pedestrian infrastructure.

Objective: Objective 1: Continue to maintain road segments, including designated turnouts where feasible, increase efforts on vegetation removal and drainage features, and improve pavement conditions in neighborhoods.

 

Racial Equity:

 

Was this item identified as an opportunity to apply the Racial Equity Toolkit?

No

 

 

Prior Board Actions:

July 7, 2020, Item #23 - Award of Design/Engineering Services Agreement for 2017 Storm Repairs along North Fitch Mountain Road.

Fiscal Summary

 Expenditures

FY23-24 Adopted

FY24-25 Projected

FY25-26 Projected

Budgeted Expenses

$107,600

 

 

Additional Appropriation Requested

 

 

 

Total Expenditures

$107,600

 

 

Funding Sources

 

 

 

General Fund/WA GF

 

 

 

State/Federal

$95,258

 

 

Fees/Other

$12,342

 

 

Use of Fund Balance

 

 

 

General Fund Contingencies

 

 

 

Total Sources

$107,600

 

 

 

Narrative Explanation of Fiscal Impacts:

Revenue and expenses associated with this acquisition are included in the FY 2023-24 Roads Capital (11051-34010103) Adopted Budget. Funding for the North Fitch Mountain Road Repair has been approved for funding through the Federal Highway Administration Emergency Relief Grant Program (FHWA-ER) for 88.53% of eligible Right of Way costs. The remaining 11.47% of eligible Right of Way costs will be funded through Prop 1B.

 

Narrative Explanation of Staffing Impacts (If Required):

N/A

 

Attachments:

Attachment 1: Location Map

Attachment 2: Right of Way Contract - Public Highway

Attachment 3:  Grant of Easement Deed

Attachment 4:  Grant of Temporary Construction Easement

 

Related Items “On File” with the Clerk of the Board:

None.