Legislation Details

File #: 2026-1113   
Type: Consent Calendar Item Status: Agenda Ready
File created: 9/30/2026 In control: Public Infrastructure
On agenda: 11/17/2026 Final action:
Title: Award of Construction Contract for the Eagle Nest Slide Repair Project
Department or Agency Name(s): Public Infrastructure
Attachments: 1. Summary Report.pdf, 2. 1 - Agreement Form.pdf, 3. 2 - Plans.pdf, 4. 3 - Bid Book-Project Manual.pdf

To: Board of Supervisors

Department or Agency Name(s): Sonoma County Public Infrastructure

Staff Name and Phone Number: Johannes J. Hoevertsz, 707-565-2550

Vote Requirement: Majority

Supervisorial District(s): Fifth

 

Title:

Title

Award of Construction Contract for the Eagle Nest Slide Repair Project

End

 

Recommended Action:

Recommended action

A)                     Award the construction contract to Pat Nelson Construction, Inc., in the amount of $543,210 for the Eagle Nest Slide Repair Project (CP40824AA) and authorize a contingency of up to 10% of the contract amount, in the amount of $54,321.

B)                     Authorize the Director of Sonoma County Public Infrastructure to execute the construction contract and any related documents, in form approved by County Counsel.

C)                     Adopt and approve the plans and specifications for the Eagle Nest Slide Repair Project.

 

end

Executive Summary:

Sonoma County Public Infrastructure (SPI) is requesting Board award of a construction contract to Pat Nelson Construction, Inc., in the amount of $543,210, authorize a 10% contingency of $54,321, and adoption of the project plans and specifications. The project will stabilize an existing landslide on County-owned real property along Eagle Nest Lane in Guerneville through installation of engineered ground support, shotcrete slope protection, drainage improvements, erosion control and site restoration to protect the adjacent roadway and improve long term slope stability.

 

Discussion:

The Eagle Nest Slide Repair Project is intended to address an existing landslide and improve the stability of the affected slope and adjacent roadway area. The existing slope has experienced movement and erosion that require stabilization measures to protect the roadway and mitigate impacts to the surrounding area. To address these conditions, the Department of Public Infrastructure initiated the Eagle Nest Slide Repair Project.

 

The project was developed to best stabilize the affected slope through the installation of engineered ground support and slope protection measures. The work includes installation of rock dowels and related ground support, shotcrete slope protection, drainage improvements, erosion control measures, and restoration of disturbed areas.

 

An invitation to bid for the project was posted through the County’s competitive procurement system. Bids were due September 29, 2026, and three bids were received.

 

The submitted bids were as follows:

1.                     Pat Nelson Construction, Inc. - $543,210

2.                     Rock Supremacy LLC - $658,690

3.                     Argonaut Constructors - $1,040,025

Pat Nelson Construction, Inc. was determined to be the lowest responsive and responsible bidder and County staff is recommending the Board award the contract to Pat Nelson Construction, Inc.  Construction is anticipated to start in late November 2026 and be completed by the end of January 2027.

 

Strategic Plan:

This item directly supports the County’s Five-year Strategic Plan and is aligned with the following pillar, goal, and objective.

 

Pillar: Climate Action and Resiliency

Goal: Goal 5: Maximize opportunities for mitigation of climate change and adaptation through land conservation work and land use policies

Objective: Objective 2: Increase investment by 5% annually on preventive maintenance on all road infrastructure/facilities.

 

Racial Equity:

 

Was this item identified as an opportunity to apply the Racial Equity Toolkit?

No

 

Prior Board Actions:

No prior Board Actions                     

 

Fiscal Summary

 Expenditures

FY 26-27 Adopted

FY 27-28 Projected

FY 28-29 Projected

Budgeted Expenses

$597,531

 

 

Additional Appropriation Requested

 

 

 

Total Expenditures

$597,531

 

 

Funding Sources

 

 

 

General Fund/WA GF

$597,531

 

 

State/Federal

 

 

 

Fees/Other

 

 

 

Use of Fund Balance

 

 

 

Contingencies

 

 

 

Total Sources

$597,531

 

 

 

Narrative Explanation of Fiscal Impacts:

The Eagle Nest Repair Project (21CP40824AA) was funded through the County’s annual Capital Improvement Program (CIP) budget process. Sufficient appropriations are available in the FY2026-27 Adopted Budget (23055 / 40806400) for the cost of the contract, $543,210 plus a 10% contingency of $54,321 for a total of $597,531.

 

Narrative Explanation of Staffing Impacts (If Required):

None

 

Attachments:

1 - Agreement Form

2 - Plans

3 - Bid Book

 

Related Items “On File” with the Clerk of the Board:

None